Golf Course

Shark River Golf Course

shark-river-golf-course.jpg

320 Old Corlies Ave.

Neptune, NJ 07753

Course Owner: Monmouth County Park System

Golf Course Website: Click here to visit

Bunker Restoration Project, Scope of Work:

Base Bid Items:

  • Renovation or removal of existing bunkers and the addition of new bunkers on holes 6, 7, 8, 9, 10, 15 & 16.

  • Expansion and/or reduction of fairway and rough areas adjacent to proposed bunker work.

  • Re-construction of tees on hole 16.

  • Removal of existing and installation of new asphalt path on hole 16.

  • Installation of erosion protection as described in plans.

Alternate Items:

  • Renovation of hole 16 green-side bunker.

  • Provision and installation of new irrigation for the 16th tee area.

  • Renovation of hole 9 fairway bunker.

  • Addition of hole 16 right fairway bunker.

Turco Golf Inc. to complete all existing turf and bunker sand removal, topsoil stripping, grading, excavating, filling, shaping, backfilling, loaming, finish work and drainage.

Photo Gallery

Coming soon!

Rye Golf Club

946896_570276312994037_14894417_n.png

330 Boston Post Road

Rye, NY 10580

Golf Course Superintendent: Chip Lafferty

Golf Course Website: https://www.ryegolfclub.com

Scope of Work

Base Bid Items:

  • Slit draining and expansion of seven existing golf course greens on Holes #5, 8, 10, 11, 13, 16 and 17.
  • The reconstruction of greens on Hole #3 and practice green.
  • The leveling, re-grassing and/or rebuilding of tees on Holes #11, 14 and 18.
  • The installation of block curbing along various cart paths adjacent to the above work.

Alternate Items:

  • Installation of Better Billy Bunker liner system in all proposed bunkers.
  • Installation of asphalt cart path connection adjacent to Hole #14 tees.

Photo Gallery

Coming soon! Fall 2018

Clinton Country Club

clinton-country-club-logo.png

128 Old Post Road

Clinton, CT 06413

Golf Course Superintendent: Mike Decker

Golf Course Architect: Jeffery Cornish

Golf Course Website: http://www.clintoncc.org

Project Scope: The scope of work for Clinton Country Club's renovations include the restoration of green-side and fairway bunkers on holes 10 through 18. The bunker surrounds will be stripped of sod and all bunker sand will be removed and excavated. Rough and finish shaping of each bunker will be required and new drainage pipes and fittings will be installed. Each bunker will have liner material installed with new bunker sand installed. Sodding of the bunker surrounds will repair the areas adversely affected by construction. In all there are 36 green-side and fairway bunkers scheduled for completion.

In addition to the bunker work, the tee box at hole 13 is also scheduled to be re-done. Many of the same construction trades will be utilized to complete the tee renovation including: earthwork, shaping, drainage, irrigation, topsoil management, seedbed preparation and feature sodding.